"YOU CAN DO IT!

EXCAVATION

Clear pool area, remove sod, and mark pool layout for excavation.

PEA GRAVEL

Add about 12”of pea gravel (about the size of a penny) to the bottom of the hole.

DELIVERY

We try to coordinate your pool delivery so the excavator can lift it directly from the truck using straps, or your crane and operator are on-site and ready.

POOL PLACEMENT

Pool is lowered into the hole. More gravel is place under any air pockets.

LEVELING

Levels are checked continuously during setting of pool.

PLUMBING

Connect plumbing, light fixtures and any other equipment.

BACKFILL & ADD WATER

The pool is filled with water while pea gravel is added around the shell in stages to maintain proper support and balance during installation.

DECKING

Add a stamped concrete, paver or wood deck. You just saved yourself tens of thousands…enjoy!

The information provided is for general guidance only. Installation requirements may vary by application, site conditions, and project specifications. Verify suitability for your project and comply with all applicable codes, standards, and manufacturer instructions.
error: Content is protected !!